The Challenge

A client was bidding for a mega-project with two commercial partners. The enquiry was urgent:

There was an imminent deadline for their joint response to the client. An external reviewer was required, the selected party had to withdraw at the last moment. Innovation stepped in.

The Solution

We started with a structured framework to review, validate and make recommendations. Within a few days we were able to mobilise an experienced team of:

  • Review Lead
  • Strategic Forensic Programme Consultant
  • Senior Planning Engineer
The Outcome

Within a 28-day window, our team carried-out an independent high-level review of each of the party’s plans and approaches. Subsequently producing a report and presentation which identified:

  • Status of each party’s preparation
  • Status of each party’s plans
  • Omissions/gaps and
  • Made remediation recommendations

The report was unanimously recognised and approved, enabling appropriate and timely rectifications to take place.

Partners

thumbnail_image006

OBJECTIVE Logo large

sal

acturial_partners

distinctive_performance

thumbnail_image004

legerity

digital_insurers

clarizes

opengraph_EES-Solutions-Engineering-RGB